# Drupal Migration Validation Beyond Record Counts: How to Prove the Platform Still Works After Cutover

Oct 7, 2021

By Oleksiy Kalinichenko

Successful **Drupal migration validation** is not just about confirming that the same number of nodes, media items, or taxonomy terms arrived in the target platform. It is about proving that critical business behavior survived cutover: content can be found, editors can work, users can access the right information, redirects resolve correctly, and integrations still receive the data they depend on.

This article reframes migration QA as a verification model for business rules and operational readiness. It outlines how enterprise teams can test publishing, search, access, URL behavior, and integration-critical content states so launch confidence is based on evidence rather than totals.

Need help applying this?

Talk through the article with an expert and turn the guidance into a practical next step.

Talk to an expert

Summarize this page with AI

[](https://chat.openai.com/?q=Summarize%20this%20page%20for%20me%3A%20https%3A%2F%2Fwww.pathtoproject.com%2Fblog%2F20211007-drupal-migration-validation-beyond-record-counts "Summarize this page with ChatGPT")[](https://claude.ai/new?q=Summarize%20this%20page%20for%20me%3A%20https%3A%2F%2Fwww.pathtoproject.com%2Fblog%2F20211007-drupal-migration-validation-beyond-record-counts "Summarize this page with Claude")[](https://www.google.com/search?udm=50&q=Summarize%20this%20page%20for%20me%3A%20https%3A%2F%2Fwww.pathtoproject.com%2Fblog%2F20211007-drupal-migration-validation-beyond-record-counts "Summarize this page with Gemini")[](https://x.com/i/grok?text=Summarize%20this%20page%20for%20me%3A%20https%3A%2F%2Fwww.pathtoproject.com%2Fblog%2F20211007-drupal-migration-validation-beyond-record-counts "Summarize this page with Grok")[](https://www.perplexity.ai/search/new?q=Summarize%20this%20page%20for%20me%3A%20https%3A%2F%2Fwww.pathtoproject.com%2Fblog%2F20211007-drupal-migration-validation-beyond-record-counts "Summarize this page with Perplexity")

![Blog: Drupal Migration Validation Beyond Record Counts: How to Prove the Platform Still Works After Cutover](https://res.cloudinary.com/dywr7uhyq/image/upload/w_764,f_avif,q_auto:good/v1/blog-20211007-drupal-migration-validation-beyond-record-counts--cover)

Teams often finish a migration run with a reassuring set of numbers: total nodes migrated, total media items loaded, total taxonomy terms created, total redirects imported. Those figures matter, but they are only a starting point.

A migration can be technically complete and still be operationally unsafe. Content may exist in Drupal, yet fail to render correctly, inherit the wrong moderation state, break a downstream API, lose a media relationship, expose the wrong access pattern, or resolve to a non-canonical URL that harms search visibility. In other words, row counts can prove that records moved. They do not prove that the platform still works.

For enterprise CMS programs, especially those involving Drupal, AEM, Sitecore, or multi-site consolidation, post-migration validation should be treated as a structured business-rule verification exercise. The goal is not only to confirm data presence, but to establish launch readiness across content, workflow, delivery, and integration behavior.

## Why migrated record counts create false confidence

Record counts are attractive because they are easy to produce, easy to compare, and easy to report upward. If the source had 125,000 content items and the target has 125,000 content items, the migration can look complete.

But totals compress away the details that usually matter most:

*   Whether the right content type mapping was applied
*   Whether required fields were populated correctly
*   Whether body content preserved expected formatting
*   Whether taxonomy relationships remained intact
*   Whether media references still resolve to usable assets
*   Whether unpublished content stayed unpublished
*   Whether redirects preserve legacy traffic paths
*   Whether role-based access still matches policy
*   Whether external systems can still retrieve or receive content

This is why **migrated content verification** should separate technical completeness from operational readiness.

Technical completeness asks: did data move?

Operational readiness asks: can the business use the platform safely after cutover?

That distinction is especially important in enterprise Drupal programs, where the same content may be consumed through rendered pages, JSON responses, search indexes, personalization layers, forms, campaign landing pages, or downstream APIs. A content item that exists in the database but fails in one of those paths is still a launch defect.

## Validation layers: data, behavior, access, and delivery

A strong **Drupal cutover validation** model usually covers four layers.

**1\. Data validation**

This is the foundational layer. It confirms that migrated entities exist and that core field values match expectations.

Typical checks include:

*   Entity counts by content type, media type, vocabulary, and user role
*   Required field population
*   Mapping accuracy for dates, booleans, references, and enumerated values
*   Detection of null, defaulted, truncated, or malformed values
*   Verification of unique identifiers used for traceability

**2\. Behavioral validation**

This proves that content behaves correctly in the application, not only in storage.

Examples include:

*   Pages render with the correct templates or component structures
*   Lists and landing pages surface expected content
*   search returns the right items for high-value queries
*   content sorting and filtering behave as expected
*   preview and publishing actions still work for editors

**3\. Access validation**

This confirms that the right users can do the right things and that the wrong users cannot.

Examples include:

*   Editorial roles can create, edit, review, and publish according to policy
*   restricted content remains restricted
*   public content is publicly accessible where intended
*   API consumers receive only the content they are allowed to access

**4\. Delivery validation**

This tests the paths through which content reaches audiences and connected systems.

Examples include:

*   Redirect resolution from legacy URLs
*   canonical behavior and duplicate URL prevention
*   search indexing eligibility
*   syndication feeds or API payloads
*   form submissions or CRM handoffs tied to migrated pages

This layered model helps QA teams avoid a common mistake: stopping at database-level verification while major user-facing or business-facing failures remain undetected.

## Proving content relationships, media references, and taxonomy integrity

Many migration defects appear not in standalone fields but in relationships.

A node may migrate successfully, but reference the wrong taxonomy term. A media entity may exist, but the node points to an outdated asset ID. A reusable component may render, but internal links inside rich text still point to legacy paths. These failures can be easy to miss in high-volume programs and can materially affect navigation, search, compliance, and brand consistency.

Validation should therefore include relationship-focused checks such as:

*   Parent-child content associations
*   Related content references
*   Author or owner references where business-critical
*   Media attachments and embedded assets
*   Taxonomy term assignments used for filtering, search, or routing
*   Internal link resolution in rich text and structured fields

For enterprise Drupal platforms, taxonomy integrity is especially important because taxonomy often drives:

*   topic landing pages
*   faceted search
*   personalization rules
*   navigation structures
*   campaign tagging
*   API filtering logic

A useful approach is to identify a set of business-critical relationship patterns and test them explicitly. For example:

*   A news article with hero image, downloadable PDF, and topic tags
*   A product or service page with related content and promotional blocks
*   A resource center page filtered by audience and content type
*   A press release surfaced through search, archive pages, and API output

For each pattern, validate both the stored relationship and the visible outcome. It is not enough to confirm that a reference field contains a target ID. The page, listing, or endpoint consuming that relationship also needs to behave correctly.

In [headless Drupal implementations](/services/cms-to-headless-migration), this becomes even more important. Relationships may exist in Drupal but fail to appear correctly in frontend applications because of serialization rules, API schema mismatches, unpublished references, or consumer-side assumptions. Validation should therefore cover both the CMS source of truth and the consuming experience.

## Testing workflows, moderation states, and editorial permissions

One of the most damaging migration failures is a silent change to editorial control.

A page may look fine to an anonymous visitor while being impossible for editors to update correctly. Moderation states may flatten during migration. Archived content may become draft or published. Review queues may no longer reflect expected ownership. Permissions may allow unauthorized publishing or block required operations.

This is why **editorial workflow testing** should be a first-class part of **CMS migration QA**.

Focus validation on the workflows that matter most after launch:

*   Creating new content in migrated content types
*   Editing migrated content without breaking existing field values
*   Moving content through review and approval states
*   Publishing and unpublishing according to policy
*   Scheduling, where applicable
*   Revising content while preserving audit expectations

Moderation-state validation should include checks for:

*   state mapping accuracy from source to Drupal
*   visibility rules for unpublished or archived items
*   workflow transitions available to each role
*   queue behavior for editorial teams
*   API exposure of unpublished content in headless scenarios

Permissions testing should be scenario-based, not only role-matrix-based. A permissions spreadsheet may say a role can edit a content type, but only hands-on testing will prove whether that role can:

*   open migrated content
*   update key fields
*   change workflow state
*   replace media
*   manage redirects or metadata
*   trigger connected publishing processes

In enterprise programs, editorial validation is often where technical completeness meets operational reality. If the content team cannot safely manage the platform on day one, the migration is not truly done.

## Redirects, canonical rules, and search-critical URL behavior

Redirect behavior is often treated as a separate SEO workstream, but it belongs directly inside **Drupal migration validation** because URL continuity affects users, search engines, campaigns, and integrations.

At minimum, validation should confirm:

*   legacy URLs resolve to intended target URLs
*   redirect chains are minimized or removed
*   high-value pages do not return unexpected 404 or 302 responses
*   canonical rules align with target URL strategy
*   duplicate routes do not create indexable variants
*   internal links point to target-state URLs where expected

For multi-site consolidations or platform replacements, this work deserves special care because multiple legacy patterns may map into a single target structure. The risk is not only broken links. It is also conflicting canonical behavior, inconsistent trailing slash rules, case sensitivity issues, or query parameter handling that changes how search engines and campaign systems interpret pages.

A practical way to structure **redirect validation** is to break it into tiers:

*   **Tier 1:** highest-traffic and highest-value URLs
*   **Tier 2:** representative samples by content type or site section
*   **Tier 3:** pattern-level checks across the full redirect set

Validation should also include rendered-page outcomes, not only HTTP status checks. A redirect that lands on the wrong content may be technically successful but still be a business failure.

For coupled Drupal sites, verify the final rendered page, metadata, and canonical output. For headless environments, also verify route resolution between Drupal-managed paths and frontend application routing behavior.

## Integration checks for CRM, forms, search, and downstream APIs

Many post-cutover issues emerge outside the CMS itself.

Migrated content may trigger forms, populate search indexes, feed external applications, or expose data to other systems. If validation stops at the Drupal UI, teams can miss defects that only appear once the platform reconnects to its ecosystem.

Common integration-sensitive areas include:

*   forms embedded on migrated landing pages
*   CRM or marketing automation handoffs
*   site search indexing and result presentation
*   downstream APIs consuming content or metadata
*   analytics or tagging dependencies tied to URL or template patterns
*   shared services used across multiple sites in a consolidation program

The validation question is not simply whether the integration is online. It is whether migrated content still satisfies the assumptions that integration depends on.

Examples:

*   A form page migrated, but required campaign metadata no longer appears in the rendered output.
*   A search index receives content, but the taxonomy fields used for filtering were remapped incorrectly.
*   An API endpoint returns nodes, but moderation or access logic excludes records that should be visible.
*   A consumer application expects a media field structure that changed during migration.

These checks are especially important for headless Drupal, where content correctness and delivery correctness are separated across systems. Validation should confirm:

*   content state in Drupal
*   API payload integrity
*   consumer rendering behavior
*   access enforcement across the chain

If downstream systems are business-critical, include them directly in acceptance criteria rather than treating them as post-launch stabilization issues.

## Sampling strategy vs exhaustive validation

Enterprise teams rarely have the time or budget to manually inspect every migrated item. The answer is not to give up and rely only on totals. The answer is to design a sampling model that is risk-based, transparent, and defensible.

An effective sampling strategy often combines three methods.

**Full-population automated or query-based checks**

Use these where rules are objective and repeatable, such as:

*   count comparisons by entity class
*   required field presence
*   detection of broken references
*   URL pattern verification
*   moderation state distribution checks

**Representative sampling**

Use this to inspect content across major types, templates, workflows, and site sections.

Examples include sampling by:

*   content type n- site or business unit
*   template or component pattern
*   editorial owner
*   publication state
*   high-volume taxonomy segments

**Risk-weighted sampling**

Prioritize items with the highest business, compliance, or traffic impact.

Typical candidates include:

*   top landing pages
*   search-entry pages
*   regulated or legal content
*   campaign destinations
*   pages with complex component structures
*   content consumed by external systems

The key is to define acceptance criteria before cutover validation begins. Teams should know what sample sizes, pass thresholds, and escalation rules will be used. Without that agreement, validation can devolve into subjective debate during the most time-sensitive launch window.

A mature validation plan also distinguishes between:

*   defects that block launch
*   defects acceptable for rapid post-launch remediation
*   known limitations already accepted by stakeholders

That decision framework matters as much as the tests themselves.

## Cutover dashboards, defect triage, and launch decision criteria

Validation only creates confidence if results can be interpreted quickly.

During cutover, teams need a simple way to see what has passed, what has failed, what remains in progress, and which issues materially affect launch readiness. A validation dashboard or command-center view can help organize this around the most important dimensions:

*   migration completion status by entity class
*   validation pass/fail status by test category
*   open defects by severity
*   unresolved risks by business function
*   sign-off owners for content, QA, engineering, SEO, and product

Defect triage should reflect business impact, not just technical neatness. A minor formatting issue on a low-traffic archive page does not belong in the same decision category as broken redirect behavior on a top landing page or incorrect permissions on restricted content.

Useful launch criteria often include questions like:

*   Are critical content types present and usable?
*   Are editorial teams able to operate core workflows?
*   Are top URLs resolving correctly?
*   Are search and discovery paths functioning acceptably?
*   Are high-risk integrations validated?
*   Are remaining defects understood, owned, and acceptable?

This is where runbooks and validation plans become essential. Teams should not decide severity, ownership, or escalation ad hoc during launch weekend. Those rules should already exist, along with clear sign-off responsibilities.

For large migrations, it can also help to define exit criteria by layer:

*   **Data exit criteria:** core entities and required fields validated
*   **Behavior exit criteria:** representative user journeys pass
*   **Access exit criteria:** key role scenarios pass
*   **Delivery exit criteria:** redirects, search, and integrations meet baseline standards

This structure keeps launch decisions anchored to evidence rather than optimism.

## Conclusion

The most reliable way to approach **[enterprise Drupal migration](/services/drupal-migration)** is to stop treating validation as a row-count exercise and start treating it as proof of business continuity.

A successful migration is not just one where nodes, terms, and media entities appear in the destination. It is one where users reach the right pages, editors can manage content safely, search and taxonomy still work, permissions remain correct, redirects preserve continuity, and connected systems continue to function as expected.

That is the standard post-cutover validation should aim for.

When teams define validation layers, test relationships and workflows, include both coupled and headless delivery paths, and adopt a risk-based sampling model with clear launch criteria, confidence becomes measurable. Instead of asking whether the data moved, stakeholders can ask the more important question: does the platform still work well enough to launch?

That is the question migration validation should answer.

Tags: Drupal migration validation, Drupal, CMS migration QA, redirect validation, editorial workflow testing, enterprise Drupal migration

## Explore Drupal Migration Validation and Cutover Readiness

These articles extend the same migration-readiness mindset by showing what must be mapped, governed, and tested before and during a Drupal cutover. Together they cover dependency discovery, media and content model risk, and the operational controls that keep publishing moving without breaking launch confidence.

[

![AEM to Drupal Migration: The Dependency Mapping Work Most Teams Underestimate](https://res.cloudinary.com/dywr7uhyq/image/upload/c_fill,w_1440,h_1080,g_auto/f_auto/q_auto/v1/blog-20230914-aem-to-drupal-migration-dependency-mapping-before-cutover--cover?_a=BAVMn6B00)

### AEM to Drupal Migration: The Dependency Mapping Work Most Teams Underestimate

Sep 14, 2023

](/blog/20230914-aem-to-drupal-migration-dependency-mapping-before-cutover)

[

![AEM Asset Rendition and Metadata Audits Before Drupal Migration: The DAM Workstream That Prevents Media Chaos Later](https://res.cloudinary.com/dywr7uhyq/image/upload/c_fill,w_1440,h_1080,g_auto/f_auto/q_auto/v1/blog-20231010-aem-asset-rendition-and-metadata-audit-before-drupal-migration--cover?_a=BAVMn6B00)

### AEM Asset Rendition and Metadata Audits Before Drupal Migration: The DAM Workstream That Prevents Media Chaos Later

Oct 10, 2023

](/blog/20231010-aem-asset-rendition-and-metadata-audit-before-drupal-migration)

[

![Drupal Migration Content Freeze Exceptions: How to Keep Publishing Moving Without Losing Cutover Control](https://res.cloudinary.com/dywr7uhyq/image/upload/c_fill,w_1440,h_1080,g_auto/f_auto/q_auto/v1/blog-20240314-drupal-content-freeze-exceptions-during-enterprise-migration--cover?_a=BAVMn6B00)

### Drupal Migration Content Freeze Exceptions: How to Keep Publishing Moving Without Losing Cutover Control

Mar 14, 2024

](/blog/20240314-drupal-content-freeze-exceptions-during-enterprise-migration)

[

![Drupal Media Model Governance Before DAM Integration: Why Asset Chaos Spreads Faster Than Teams Expect](https://res.cloudinary.com/dywr7uhyq/image/upload/c_fill,w_1440,h_1080,g_auto/f_auto/q_auto/v1/blog-20231107-drupal-media-model-governance-before-dam-integration--cover?_a=BAVMn6B00)

### Drupal Media Model Governance Before DAM Integration: Why Asset Chaos Spreads Faster Than Teams Expect

Nov 7, 2023

](/blog/20231107-drupal-media-model-governance-before-dam-integration)

[

![Sitecore to Drupal Migration: How to Map Workflow and Personalization Boundaries Before the Rebuild](https://res.cloudinary.com/dywr7uhyq/image/upload/c_fill,w_1440,h_1080,g_auto/f_auto/q_auto/v1/blog-20220915-sitecore-to-drupal-migration-workflow-and-personalization-boundaries--cover?_a=BAVMn6B00)

### Sitecore to Drupal Migration: How to Map Workflow and Personalization Boundaries Before the Rebuild

Sep 15, 2022

](/blog/20220915-sitecore-to-drupal-migration-workflow-and-personalization-boundaries)

[

![Drupal 7 Custom Module Business Logic Audits Before Migration](https://res.cloudinary.com/dywr7uhyq/image/upload/c_fill,w_1440,h_1080,g_auto/f_auto/q_auto/v1/blog-20201022-drupal-7-custom-module-business-logic-audit-before-migration--cover?_a=BAVMn6B00)

### Drupal 7 Custom Module Business Logic Audits Before Migration

Oct 22, 2020

](/blog/20201022-drupal-7-custom-module-business-logic-audit-before-migration)

## Explore Drupal Migration Validation Services

If you are validating a Drupal migration after cutover, these services help you move from record counts to real operational confidence. They cover the migration work itself, the content and data structures behind it, and the integrations and APIs that must keep working after launch. Together they support a safer replatforming, stronger verification, and a more stable post-go-live operating model.

[

### Drupal Migration

Drupal content migration engineering for data, content, and platform change

Learn More

](/services/drupal-migration)[

### Drupal Content Architecture

Drupal content architecture design and editorial operating design

Learn More

](/services/drupal-content-architecture)[

### Drupal API Development

Drupal API development services for secure integration layers

Learn More

](/services/drupal-api-development)[

### Drupal Search Architecture

Scalable indexing and relevance design

Learn More

](/services/drupal-search-architecture)[

### Drupal CDP Integration

Drupal event tracking architecture, identity, and audience sync engineering

Learn More

](/services/drupal-cdp-integration)[

### Drupal Analytics Integration

Drupal GA4 event tracking and enterprise instrumentation

Learn More

](/services/drupal-analytics-integration)

## Explore Drupal Migration and Validation

These case studies show how migration work is proven in practice through content integrity, workflow continuity, search behavior, and integration stability. They are useful companions to a post about validating Drupal cutover beyond simple record counts because they demonstrate the operational checks that keep a platform usable after launch.

\[01\]

### [Copernicus Marine ServiceCopernicus Marine Service Drupal DXP case study — Marine data portal modernization](/projects/copernicus-marine-service-environmental-science-marine-data "Copernicus Marine Service")

[![Project: Copernicus Marine Service](https://res.cloudinary.com/dywr7uhyq/image/upload/w_644,f_avif,q_auto:good/v1/project-copernicus--challenge--01)](/projects/copernicus-marine-service-environmental-science-marine-data "Copernicus Marine Service")

[Learn More](/projects/copernicus-marine-service-environmental-science-marine-data "Learn More: Copernicus Marine Service")

Industry: Environmental Science / Marine Data

Business Need:

The existing marine data portal relied on three unaligned WordPress installations and embedded PHP code, creating inefficiencies and risks in content management and usability.

Challenges & Solution:

*   Migrated three legacy WordPress sites and a Drupal 7 site to a unified Drupal-based platform. - Replaced risky PHP fragments with configurable Drupal components. - Improved information architecture and user experience for data exploration. - Implemented integrations: Solr search, SSO (SAML), and enhanced analytics tracking.

Outcome:

The new Drupal DXP streamlined content operations and improved accessibility, offering scientists and businesses a more efficient gateway to marine data services.

“Oleksiy (PathToProject) is demanding and responsive. Comfortable with an Agile approach and strong technical skills, I appreciate the way he challenges stories and features to clarify specifications before and during sprints. ”

Olivier RitlewskiIngénieur Logiciel chez EPAM Systems

\[02\]

### [United Nations Convention to Combat Desertification (UNCCD)United Nations website migration to a unified Drupal DXP](/projects/unccd-united-nations-convention-to-combat-desertification "United Nations Convention to Combat Desertification (UNCCD)")

[![Project: United Nations Convention to Combat Desertification (UNCCD)](https://res.cloudinary.com/dywr7uhyq/image/upload/w_644,f_avif,q_auto:good/v1/project-unccd--challenge--01)](/projects/unccd-united-nations-convention-to-combat-desertification "United Nations Convention to Combat Desertification (UNCCD)")

[Learn More](/projects/unccd-united-nations-convention-to-combat-desertification "Learn More: United Nations Convention to Combat Desertification (UNCCD)")

Industry: International Organization / Environmental Policy

Business Need:

UNCCD operated four separate websites (two WordPress, two Drupal), leading to inconsistencies in design, content management, and user experience. A unified, scalable solution was needed to support a large-scale CMS migration project and improve efficiency and usability.

Challenges & Solution:

*   Migrating all sites into a single, structured Drupal-based platform (government website Drupal DXP approach). - Implementing Storybook for a design system and consistency, reducing content development costs by 30–40%. - Managing input from 27 stakeholders while maintaining backend stability. - Integrating behavioral tracking, A/B testing, and optimizing performance for strong Google Lighthouse scores. - Converting Adobe InDesign assets into a fully functional web experience.

Outcome:

The modernization effort resulted in a cohesive, user-friendly, and scalable website, improving content management efficiency and long-term digital sustainability.

“It was my pleasure working with Oleksiy (PathToProject) on a new Drupal website. He is a true full-stack developer—the ideal mix of DevOps expertise, deep front-end knowledge, and the structured thinking of a senior back-end developer. He is well-organized and never lets anything slip. Oleksiy understands what needs to be done before being asked and can manage a project independently with minimal involvement from clients, product managers, or business analysts. One of the best consultants I’ve worked with so far. ”

Andrei MelisTechnical Lead at Eau de Web

\[03\]

### [VeoliaEnterprise Drupal Multisite Modernization (Acquia Site Factory, 200+ Sites)](/projects/veolia-environmental-services-sustainability "Veolia")

[![Project: Veolia](https://res.cloudinary.com/dywr7uhyq/image/upload/w_644,f_avif,q_auto:good/v1/project-veolia--challenge--01)](/projects/veolia-environmental-services-sustainability "Veolia")

[Learn More](/projects/veolia-environmental-services-sustainability "Learn More: Veolia")

Industry: Environmental Services / Sustainability

Business Need:

With Drupal 7 reaching end-of-life, Veolia needed a Drupal 7 to Drupal 10 enterprise migration for its Acquia Site Factory multisite platform—preserving region-specific content and multilingual capabilities across more than 200 sites.

Challenges & Solution:

*   Supported Acquia Site Factory multisite architecture at enterprise scale (200+ sites). - Ported the installation profile from Drupal 7 to Drupal 10 while ensuring platform stability. - Delivered advanced configuration management strategy for safe incremental rollout across released sites. - Improved page loading speed by refactoring data fetching and caching strategies.

Outcome:

The platform was modernized into a stable, scalable multisite foundation with improved performance, maintainability, and long-term upgrade readiness.

“As Dev Team Lead on my project for 10 months, Oleksiy (PathToProject) demonstrated excellent technical skills and the ability to handle complex Drupal projects. His full-stack expertise is highly valuable. ”

Laurent PoinsignonDomain Delivery Manager Web at TotalEnergies

\[04\]

### [Bayer Radiología LATAMSecure Healthcare Drupal Collaboration Platform](/projects/bayer-radiologia-latam "Bayer Radiología LATAM")

[![Project: Bayer Radiología LATAM](https://res.cloudinary.com/dywr7uhyq/image/upload/w_644,f_avif,q_auto:good/v1/project-bayer--challenge--01)](/projects/bayer-radiologia-latam "Bayer Radiología LATAM")

[Learn More](/projects/bayer-radiologia-latam "Learn More: Bayer Radiología LATAM")

Industry: Healthcare / Medical Imaging

Business Need:

An advanced healthcare digital platform for LATAM was required to facilitate collaboration among radiology HCPs, distribute company knowledge, refine treatment methods, and streamline workflows. The solution needed secure medical website role-based access restrictions based on user role (HCP / non-HCP) and geographic region.

Challenges & Solution:

*   Multi-level filtering for precise content discovery. - Role-based access control to support different professional needs. - Personalized HCP offices for tailored user experiences. - A structured approach to managing diverse stakeholder expectations.

Outcome:

The platform enhanced collaboration, streamlined workflows, and empowered radiology professionals with advanced tools to gain insights and optimize patient care.

“Oleksiy (PathToProject) and I worked together on a Digital Transformation project for Bayer LATAM Radiología. Oly was the Drupal developer, and I was the business lead. His professionalism, technical expertise, and ability to deliver functional improvements were some of the key attributes he brought to the project. I also want to highlight his collaboration and flexibility—throughout the entire journey, Oleksiy exceeded my expectations. It’s great when you can partner with vendors you trust, and who go the extra mile. ”

Axel Gleizerman CopelloBuilding in the MedTech Space | Antler

“Oleksiy (PathToProject) is a great professional with solid experience in Drupal. He is reliable, hard-working, and responsive. He dealt with high organizational complexity seamlessly. He was also very positive and made teamwork easy. It was a pleasure working with him. ”

Oriol BesAI & Innovation (Discovery, Strategy, Deployment, Scouting) for Business Leaders

\[05\]

### [London School of Hygiene & Tropical Medicine (LSHTM)Higher Education Drupal Research Data Platform](/projects/lshtm-london-school-of-hygiene-tropical-medicine "London School of Hygiene & Tropical Medicine (LSHTM)")

[![Project: London School of Hygiene & Tropical Medicine (LSHTM)](https://res.cloudinary.com/dywr7uhyq/image/upload/w_644,f_avif,q_auto:good/v1/project-lshtm--challenge--01)](/projects/lshtm-london-school-of-hygiene-tropical-medicine "London School of Hygiene & Tropical Medicine (LSHTM)")

[Learn More](/projects/lshtm-london-school-of-hygiene-tropical-medicine "Learn More: London School of Hygiene & Tropical Medicine (LSHTM)")

Industry: Healthcare & Research

Business Need:

LSHTM required improvements to its existing higher education Drupal platform to better manage and distribute complex research data, including support for third-party integrations, Drupal performance optimization, and more reliable synchronization.

Challenges & Solution:

*   Implemented CSV-based data import and export functionality. - Enabled dataset downloads for external consumers. - Improved performance of data-heavy pages and research content delivery. - Stabilized integrations and sync flows across multiple data sources.

Outcome:

The solution improved data accessibility, streamlined research workflows, and enhanced system performance, enabling LSHTM to manage complex datasets more efficiently.

“Oleksiy (PathToProject) has been a valuable developer resource over the past six months for us at LSHTM. This included coming on board to revive and complete a stalled Drupal upgrade project, as well as carrying out work to improve our site accessibility and functionality. I have found Oleksiy to be very knowledgeable and skilful and would happily work with him again in the future. ”

Ali KazemiWeb & Digital Manager at London School of Hygiene & Tropical Medicine

![Oleksiy (Oly) Kalinichenko](https://res.cloudinary.com/dywr7uhyq/image/upload/c_fill,w_200,h_200,g_center,f_avif,q_auto:good/v1/contant--oly)

### Oleksiy (Oly) Kalinichenko

#### CTO at PathToProject

[](https://www.linkedin.com/in/oleksiy-kalinichenko/ "LinkedIn: Oleksiy (Oly) Kalinichenko")

### Do you want to start a project?

Send